INDUSTRIAL AUDIT & AEROSPACE LOGISTICS

Independent technical analysis of aerospace manufacturing technology, deep space supply chain optimization, and space exploration investment trends. We audit the hardware of the multi-planetary economy.

ACCESS TECHNICAL REPORTS

01 // ARTEMIS PROGRAM (2026 STRATEGIC REVIEW)

NOV 2022 // COMP

Artemis I: Architecture Validation

Metrics: 39 MN thrust. DRO record (432,210 km). Successful Mach 32 thermal reentry analysis completed.

VIEW TECHNICAL DOSSIER
APR 2026 // T-MINUS

Artemis II: Crewed Lunar Flyby

First crewed mission. ECLSS certification and RPOD maneuvers with ICPS stage. 10-day cislunar mission profile.

VIEW TECHNICAL DOSSIER
MID 2027 // EST

Artemis III: LEO Operational Rehearsal

"Apollo 9" Strategy. Validation of Orion-Starship HLS docking via NDS and AxEMU lunar suit field certification.

VIEW TECHNICAL DOSSIER
2028-Q1 // EST

Artemis IV: South Pole Landing

Crewed landing mission. Direct Orion-HLS integration and debut of the SLS Block 1B with EUS for surface access.

VIEW TECHNICAL DOSSIER
LATE 2028 // EST

Artemis V: Blue Moon & Toyota Rover

Blue Moon Mark 2 lander debut. Deployment of the Toyota Lunar Cruiser and nuclear power infrastructure setup.

VIEW TECHNICAL DOSSIER

02 // TECHNICAL ARSENAL (HARDWARE)

SLS Block 1

NASA Heavy Lift Vector

39.1 MN THRUST // 27t LUNAR

Falcon 9 B5

Reusable Logistics Platform

REUSABLE // BLOCK 5

Starship HLS

Heavy Lunar Lander

100t PAYLOAD // FFSC 350 BAR

Senior Analyst's Log

BSX Space was established to audit the hardware and aerospace precision machining standards taking us beyond LEO. As a Senior Systems Engineer, my focus is on the aerospace supply chain and the defense logistics required for permanent lunar presence. We provide objective data for the private space launch market and institutional stakeholders.

-- Authored by: Andres BSX, Senior Systems Engineer & Technical Lead

> ANALYST: ANDRESBSX

> LOCATION: GLOBAL / ESP

> STATUS: MONITORING PROGRAM UPDATE 2026